Automotive supplier — 3 sites, 480 staff
AutomotiveContext
OEE was calculated in a spreadsheet by each shop manager, with different definitions from one site to the next. No comparison was possible and short stoppages escaped measurement entirely.
Solution
Controller data capture on 22 lines, a downtime cause dictionary shared by the three sites, OEE computed in the MES and shop floor screens refreshed every minute. Piloted on one line for ten weeks before roll-out.
Results
- OEE up from 61 % to 74 % within twelve months
- Short stoppages finally visible: 31 % of lost time
- Production meeting cut from 45 to 15 minutes