+33 1 84 80 00 00 contact@wpqm-manufacturing.tech

Industrial architecture

A digital factory is built in layers. Each has its own tempo, constraints and owners. Confusing them is the most common cause of failure in integration projects.

CIM

The CIM model

Computer Integrated Manufacturing describes the factory as an integrated whole where design, planning, execution and control share the same reference data. Its contribution is organisational rather than technological: it forces you to decide who owns the truth about each piece of data — the item, the bill of materials, the routing, the equipment — and how that truth travels.

CIM

  • A single reference for items, bills of materials and routings
  • Documented, versioned and testable exchanges between layers
  • A clear separation between management decisions and execution decisions
ISA-95

The ISA-95 levels

Select a level to see its role, its systems and its exchanges with neighbouring layers.

Planning, purchasing, costing and customer relations. This level thinks in days and weeks; it is not meant to drive a machine.

Systems
ERP, APS, PLM, business intelligence
Tempo
Hour to week
Data exchanged
Requirements, planned orders, consumption, costs

The layer that turns a works order into executable operations, then returns shop floor reality to management. Traceability, OEE and the batch record all live here.

Systems
MES, LIMS, CMMS, WMS, data historian
Tempo
Second to minute
Data exchanged
Works orders, declarations, inspections, genealogy

Real-time equipment control: sequences, safety, regulation. This level guarantees the machine does what it is told, independently of any IT connection.

Systems
PLCs, SCADA, HMI panels
Tempo
Tens of milliseconds
Data exchanged
Machine states, active recipes, alarms, counters

The interface between the physical and digital worlds. The quality of instrumentation sets the accuracy ceiling for the whole architecture above it.

Systems
Sensors, drives, valves, code readers, scales
Tempo
Millisecond
Data exchanged
Analogue and discrete signals, individual measurements

Material, machines and actual transformations. This level holds no software: it is what every layer above is trying to represent faithfully.

Systems
Conveyors, ovens, presses, tanks, robots
Tempo
Continuous
Data exchanged
Physical quantities: temperature, pressure, position, flow

Interactive diagram — click a level or use the arrow keys.

Downwards: requirements, works orders, bills of materials, recipes and control plans flow from management to the shop floor.

Upwards: produced quantities, actual consumption, time spent, measurements and events flow from the shop floor back to management.

Two directions of travel

The mistakes we see most often

  • Wiring the ERP straight to the controllers, then finding that any shop floor change breaks the accounts.
  • Pushing management decisions down to level 2, where they become invisible and unauditable.
  • Collecting data at scale without first defining the decision it is meant to inform.
  • Ignoring degraded mode: what does the shop floor do when the network goes down?

Planning a connected factory?

Describe your industrial context. We come back to you within two working days with an initial read of your situation.

Request a consultation